Running Projects:

 

Here is the list of the executed projects or expected to be executed before the end of year 2010 via HS-EPC:

 

1- Memory Mapping of Three line up Low Voltage Motor Control Centre (MCC) For KARAN UTILITY & COGENERATION ) ARAMCO and Petrofac.

 

2-Testing and Commissioning of the Motor Control Center for Saudi ARAMCO at HURIMILA project.

 

3-  We had complete the study of the four projects for Saudi Telecom Company to supply and insulation of Dray Type Transformers with laying the cables and termination for Saudi ARAMCO Projects at Shiba , Manifa, Ras Tanura and Kharasania.

 

4- We had completed the Estimation of the Electrical Work for LULU Hypermarket Project in Jubail.

 

5- We had completed the Estimation of the Installation of the Electrical Equipments for Steel Factory Al-Tuwairqi in Dammam, Second Industrial city.

 

Executed Projects:

 

1- Commercial Building in Al-Khobar (SAMA Showroom) with two story apartment 40 flats all the electrical installation work including cabling, all Panelboard and switchboard installation, cable termination and testing and commissioning.

 

SAMA

 

2- NABAH Factory in the second industrial city all the electrical work installation of the switchgear and all the distribution panels (switchboard and panel board electrical installation lighting.

 

NABHA

 

3- Manufacturing of the Fuse Biller indoor and outdoor Qty 670. for SCECO Center. When I was working with HAWA Factory.

 

4- Sea Water Cooling Project for Royal Commission in Jubail. Design of the Control and Monitoring System via PLC between Medium-Low, Voltage Panels and Control Room. When I was working with WESCOSA Factory.  

 

5- Steam Power Plant Project for Royal Commission in Yanbu. Design of the Motor Control Center (MCC’s). When I was working with WESCOSA Factory.

6- Fuel Pumps in King Khalid Air Port in Riyadh for Saudi ARAMCO. Design of the Motor Control Center (MCC’s). When I was working with WESCOSA Factory.

 

7- Pumps Station in Abqaq Refinery for Saudi ARAMCO. Design of the Motor Control Center (MCC’s). When I was working with WESCOSA Factory.

 

8- Riyadh Refinery Project for Saudi ARAMCO. Design of the Control between Medium Voltage Switchgear and Control Room DCS via PLC. When I was working with WESCOSA Factory.

 

9- Ras Tanura Refinery Project for Saudi ARAMCO. Design of the Motor Control.

 